Question: Using the grid elevations obtained from the site contour data, calculate the volume of earthwork required to grade the lot to the finished elevations indicated
Using the grid elevations obtained from the site contour data, calculate the volume of
earthwork required to grade the lot to the finished elevations indicated below. ALL
calculations must be submitted to get full marks.
The lot is to be graded to a downward slope of from E to W from line G at an elevation of
Grid size is to be
Compaction factor
Swell factor
Determine:
a Volume of Fill Material bank measure
b Volume of Cut Material bank measure
c Volume of fill requiredloose
d Volume of cut to move loose
e Volume of import or disposal
f Number of truck to remove haul material, if a
tandem dump
truck can haul of loose material.
Use Grid Method
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock