Question: Using the information given, Answer everything under Your job is to do the following. PLEASE ANSWER THIS IN FULL DETAIL AND SHOW STEPS. NEED IT

Using the information given, Answer everything Using the information given, Answer everything under "Your job is to do the following". PLEASE ANSWER THIS IN FULL DETAIL AND SHOW STEPS. NEED IT ASAP!
The Acme Corporation is having a difficult time meeting their customer's needs in terms of production output. The situation is as follows. Acme Corp is a mid-sized manufacturer of safety equipment. One of the main product lines consists of a residential smoke detector. The smoke detector consists of 12 components currently sourced from Vietnam as well as hardware, batteries and packaging that are sourced locally. Current plans call for 2.400 units to ship per day. Acme wants to set up 3 lines with the goal of each line producing 300 units per day. They brought in a consulting group and they developed the following predetermined standards The times below represent the normalized times - Acme wants to selya BD factor of 10 The operations and standard cycle times are below. The operations are in the order they need to be performed Element 1 load base unit and circuit board on line Element 2 Place two screws on circuit board and power screw in Element Snap 9 volt battery into place Element 4 Sold 2 lead wires 27 seconds 13 seconds 11 seconds 24 second 21 seconds Element Test Unit 12 seconds Element 6 of unit passes place passed inspection decalon (19/201 unit fais place unit in repair bay (1/20) (also 12 seconds) Element 7 Put units into box and place onto shipping container 17 seconds Element & Repair defective units (1/20 fail)-retest-place decalon and place in box 8.33 minutes average time to repair 25 seconds pro rated Element 9 Shrink wrap pallet and take to shipping with a pallet ock 11 minutes average time-25 units per pallet 26.4 seconds The above operators with the exception of the repair station rotate positions once per hour to minimize exposure to carpel tunnel Your job is to do the following 1) Determine the number of operators required on the sembly line. Detail your methodology need to see all the supporting numbers 2) Develop the assembly lines - each operator needs 100 feet in addition there should be another 5000 sq feet for raw materials Show the department layout highlighting the material flow of raw material into the assembly lines, the assembly process and material flowing to the shipping department This should be presented in a manner that a consultant would deliver to a customer The Acme Corporation is having a difficult time meeting their customer's needs in terms of production output. The situation is as follows. Acme Corp is a mid-sized manufacturer of safety equipment. One of the main product lines consists of a residential smoke detector. The smoke detector consists of 12 components currently sourced from Vietnam as well as hardware, batteries and packaging that are sourced locally. Current plans call for 2.400 units to ship per day. Acme wants to set up 3 lines with the goal of each line producing 300 units per day. They brought in a consulting group and they developed the following predetermined standards The times below represent the normalized times - Acme wants to selya BD factor of 10 The operations and standard cycle times are below. The operations are in the order they need to be performed Element 1 load base unit and circuit board on line Element 2 Place two screws on circuit board and power screw in Element Snap 9 volt battery into place Element 4 Sold 2 lead wires 27 seconds 13 seconds 11 seconds 24 second 21 seconds Element Test Unit 12 seconds Element 6 of unit passes place passed inspection decalon (19/201 unit fais place unit in repair bay (1/20) (also 12 seconds) Element 7 Put units into box and place onto shipping container 17 seconds Element & Repair defective units (1/20 fail)-retest-place decalon and place in box 8.33 minutes average time to repair 25 seconds pro rated Element 9 Shrink wrap pallet and take to shipping with a pallet ock 11 minutes average time-25 units per pallet 26.4 seconds The above operators with the exception of the repair station rotate positions once per hour to minimize exposure to carpel tunnel Your job is to do the following 1) Determine the number of operators required on the sembly line. Detail your methodology need to see all the supporting numbers 2) Develop the assembly lines - each operator needs 100 feet in addition there should be another 5000 sq feet for raw materials Show the department layout highlighting the material flow of raw material into the assembly lines, the assembly process and material flowing to the shipping department This should be presented in a manner that a consultant would deliver to a customer

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!