Question: Using the information provided in the table, the network diagram and the project completion time = 25 weeks, calculate the minimum time for completing the

Using the information provided in the table, the

Using the information provided in the table, the network diagram and the project completion time = 25 weeks, calculate the minimum time for completing the project possible. Normal Crash Time Normal Time Crash Maximum weeks Reduced Crash Cost per Week ($) Activity (weeks) Cost ($) (weeks) Cost ($) A 2 500 1 900 1 400 B 4 600 3 700 1 100 C 6 800 3 1,300 3 167 D 1,500 4 2,150 2 325 E 6 1,750 4 2,250 2 250 F 5 1,200 5 1,200 0 0 G 7 1,500 5 1,800 2 150 H 4 500 4 500 0 AON network diagram: A directed graph. Node A points to nodes B, C, and D. Node B points to node E. Node C points to nodes E and F. Node D points to node F. Nodes E and F point to node G. Node G points to node H. Minimum project completion time = weeks 10 6 O

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!