Question: Using the Major Estimate Analytic Method for Building Estimate / Service mention in previous lecture, Discuss their respective significances, benefits and necessary limitations & Oversite
Using the Major Estimate Analytic Method for Building EstimateService mention in previous lecture, Discuss their respective significances, benefits and necessary limitations
& Oversite Mass Concrete :: using rate le m
Using Ceramic Tiling for floor using rate le
Plastering and rendering of walls using rate le
Painting of walls internally and externally using emulsion base paint using rate le
Metal double swing windows using rate le In Nos
Metal single window toilet window using rate le In Nr
All metal Double door using rate le In Nos
Timber single door using rate le In Nrs
Use the Major Estimate Analytic Methods for Building EstimatesServices as discuss from previous lecture give their respective Significances, Benefits and Limitations.Dokyid
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
