Question: Using the NEC 4 ECC - A project for a new hotel using the NEC 4 Engineering and Construction Contract includes Option X 9 and
Using the NEC ECC A project for a new hotel using the NEC Engineering and Construction Contract includes Option X and X The Scope requires the Contractor to prepare drawings showing layouts for each of the bedrooms. The drawings are prepared by the Contractor's inhouse architect. The Client is considering building another hotel in two years' time and wants to use the layouts for preparing a planning application. Which ONE of the following statements best describes what the Client is allowed to doSelect ONE option.A The Client may use the drawings for the other hotel providing there are no exceptions to this stated in the ScopeB The Client may use the drawings provided they have paid the ContractorC The Client is not allowed to use the drawings for the other hotelD The Client may use the drawings for the other hotel providing the Contractor has prepared the drawings using the skill and care normally used by professionals designing works similar to the worksE The Client may use the drawings for the other hotel providing the architect gives the Client permission
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
