Question: Using the NEC 4 ECC - A project for a new hotel using the NEC 4 Engineering and Construction Contract includes Option X 9 and

Using the NEC4 ECC -A project for a new hotel using the NEC4 Engineering and Construction Contract includes Option X9 and X15. The Scope requires the Contractor to prepare drawings showing layouts for each of the bedrooms. The drawings are prepared by the Contractor's in-house architect. The Client is considering building another hotel in two years' time and wants to use the layouts for preparing a planning application. Which ONE of the following statements best describes what the Client is allowed to do?Select ONE option.A The Client may use the drawings for the other hotel providing there are no exceptions to this stated in the ScopeB The Client may use the drawings provided they have paid the ContractorC The Client is not allowed to use the drawings for the other hotelD The Client may use the drawings for the other hotel providing the Contractor has prepared the drawings using the skill and care normally used by professionals designing works similar to the worksE The Client may use the drawings for the other hotel providing the architect gives the Client permission

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!