Question: using this data above a b s 14.000. 0.055 0.019 k 0.027 manufacture the part has a standard deviation of mm. a) Calculate the process
manufacture the part has a standard deviation of mm. a) Calculate the process capability ratio Cp. b) If there occurs a shift of kmm from the target in the process, calculate the process capability ratios Cp,Cpl,Cpu and Cpk. c) Are the capability ratios Cp and Cpk.calculated in b satisfactory? Why? The values specific to your student number for a,b,s and k are given in the additional tables. 2. A company uses the following acceptance-single sampling procedure. A sample of size n from the lot of N items is taken and inspected. If c or less of the items in the sample are defective, the lot is accepted; otherwise, it is rejected. a) Assume that the quality level (lot fraction defective) is p. What is the probability of acceptance Pa of an incoming lot? b) Consider annually 200 lots coming from the supplier. With application of this sampling procedure and the given quality level p, what is the annual expected number of rejected lots? c) Estimate Average Ongoing Quality for the given sampling procedure. d) Estimate Average Total Inspection for the given sampling procedure. The values specific to your student number for N,n,c and p are given in the additional tables
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
