Question: Using Word or Excel, create a work breakdown structure ( WBS ) of this project with the information you have been provided to - date.
Using Word or Excel, create a work breakdown structure WBS of this project with the information you have been provided todate. Place a circle around all workpackages. Upload the file here.
You are the Project Manager for a new car design, the Fmarge The project will have a total project budget of $ Your project consists of a new engine, chassis and interior. So far, the engine team has work for three out of their four groups; mechanocal. electrical and chemical. The Mechanical team will take the longest and will consist of a new engine block, a new fuel injector, an alternator, a radiator and a waterpump. The Electrical design of the car will require both new high and low amperage circuitry. Interior design is estimated to require hours to design which will include both a leather and cloth option. The entire project must be completed in months. Furthermore, there is a union strike looming that could substantially impact your project.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
