Question: v Complete a network diagram based on Text Figure 6.20 (also seen in screenshot ' ' ' below) without using the Lags. Once done, address

 v Complete a network diagram based on Text Figure 6.20 (alsoseen in screenshot ' ' ' below) without using the Lags. Once

v Complete a network diagram based on Text Figure 6.20 (also seen in screenshot ' ' ' below) without using the Lags. Once done, address how the overall project duration is impacted, how the critical path has changed (or not) and at least one additional observation about how the Network is altered by not using Lags. a Complete your answer in Smartsheet {i.e. create a Gantt network schedule without lags, show the critical path and also the Predecessor column] and print the resulting diagram as a pdf. Refer to the Learning Materials video on Smartsheet for additional guidance. Submit the pdf with a written explanation (minimum 50 words) that answers the questions posed. - Note #1 - Do not alter the relationships/dependencies of the tasks - you only should remove the lags. - Note #2 - Activity E needs a little more guidance since Figure 6.20 shows it having both a SS and FF relationship to Activity D. In your re-work, simplify things by gg Activity E a standard Finish-Start relationship with Activity_D. 0 A 5 5 F 0 Design 19 system 5 11 System 0 documentation 0 5 10 16 3 19 12 E 17 Lag 2 4 Test Lag 2 system 0 16 2 17 3 B 8 C Lag 3 10 10 D 16 Order Lag 4 hardware 0 Install Lag 1 hardware 0 Install software 3 4 8 2 10 10 6 16 Legend ES ID EF SL Description SL LS Duration LF

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!