Question: Ven that will be made on an assembly line. The schedule requires 80 ovens in an 8-hour day. The assembly includes seven tasks. The table

Ven that will be made on an assembly line. The
Ven that will be made on an assembly line. The schedule requires 80 ovens in an 8-hour day. The assembly includes seven tasks. The table below indicates the performance time and the sequence requirements for each task. Performance Time Task must follow Task (minutes) Task listed below A 1 B 2 A 3 B D 2 B E 4. CD F 1 E G 2 F 1 (a) What is the cycle time for this assembly operation? (b) Draw the precedence diagram. (c) What is your line efficiency of the assembly line you just designed