Question: Given the following project network, baseline, and status information, develop status reports for periods 2.4.6.8 and and complete the performance indexes table. Calculate the EACF





Given the following project network, baseline, and status information, develop status reports for periods 2.4.6.8 and and complete the performance indexes table. Calculate the EACF and the VACHI LEGEND 4 C 8 ES ID EF 2 2 SL SL 6 4 10 A 4 LS DUR LE 1 1 1 5 5 D 10 10 F 12 0 0 0 0 5 5 10 10 2 12 5 0 O 5 5 5 E 8 2 2 7 3 10 ID Budget ($000) 0 1 2 3 4 un 6 7 8 9 10 11 12 A 40 10 10 10 10 B 32 8 4 8 4 00 48 12 12 12 12 D 6 18 N N 6 2 00 28 8 12 E 20 20 F 40 26 2 6 22 26 20 20 Total 18 14 20 206 18 14 18 84 32 50 64 Cumulative 110 132 158 160 166 186 206 (Do not round intermediate calculations. Enter all answers to 2 decimal precision. Enter PCI-B in percent format (e.g., enter 73.05% if the decimal equivalent is 0.7305.) Status Report: Ending Period 2 Task Complete 80.00 B 50.00 EV AC PV CV SV 28 00 Cumulative Totals 11.00 39 00 Status Report: Ending Period 4 Task % Complete A 100 EV AC PV CV SV 39.00 B 100 Cumulative Totals 21 00 60.00 EV Status Report: Ending Period 6 Task % Complete 100 B 100 AC PV CV SV 75 00 39 00 21 00 26.00 0.00 11 00 9700 D 0 E 50 00 Cumulative Totals Status Report: Ending Period 8 Task % Complete A 100 EV AC PV CV SV 39.00 B 100 C 100 D 35.00 100 21 00 31.00 20.00 19 00 130.00 E Cumulative Totals PV SPI PCI-B Performance Indexes Summary Period EV AC 2 39.00 4 60 00 6 97.00 8 130.00 % 4 % 8 % EACH VACE
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
