Question: We are trying to create a Guidelines: Project Execution Plan: II. Management and Organization Section: Project organization, management and personnel requirements. B. Manpower: Workforce requirements

We are trying to create a Guidelines: Project

We are trying to create a

Guidelines:

Project Execution Plan:

II. Management and Organization Section: Project organization, management and personnel requirements.

B. Manpower: Workforce requirements estimates, skills, expertise, and strategies for locating and recruiting qualified people.

by using the above guideline to answer B,

------> ii. For B, define only the skills and expertise required. Give at least one skill and/or one expertise. Recruiting strategies is NOT required.

(What you need to answer has the arrow ----->) What is above is just PEP guidelines for that part.

CASE 11.3 THE NELSON MANDELA BRIDGE34 Newtown, South Africa, is a suburb of Johannesburg that boasts a rich cultural heritage. As part of an attempt to help rejuvenate Newtown, the Nelson Mandela Bridge was constructed to link it to important roads and centers of commerce in Johannesburg. Spanning 42 electrified railway lines, the bridge (Figure 11.10) has been acclaimed for its functionality and beauty. Lack of space for the support pylons (towers) between the railway lines dictated that the bridge design would have a long span. This resulted in a structure with the bridge deck supported by stay cables from pylons of unequal height. The pylons on the northern side are 48 meters high, and those on the southern side are 35 meters high. The pylons are composite columns consisting of steel tubes that had to be filled with concrete after being hoisted into the vertical position. The decision was made to pump the concrete into the tubes through a port at the bottom of each tube. This had to be done in a single operation. Although the technology for casting concrete this way was not new, the columns were the highest in South Africa, and filling them would set a world record for bottom-up pumping of self-curing concrete. The pump for the concrete was placed at ground level between the electrified railway lines, which exposed workers to the risks of being near continuous rail operations. The pumping method posed the risk of the stone aggregate and cement in the concrete mixture segregating in the pylon tubes before the concrete solidified, which would compromise the strength of the concrete. Another risk was that the pump might fail and result in the concrete solidifying in an uncompleted pylon, rendering further pumping of concrete from the bottom impossible. Two contingencies were considered: an additional pump on stand by and completing the process by pouring concrete from the top of the pylon. The concrete had to be transported by trucks to the site, which risked interrupting the concrete supply owing to traffic congestion in the city. Despite working over a busy yard with trains running back and forth, no serious accident occurred at any time in the 420,000 labor-hours project. The pump never failed, and construc- tion finished on time. The stay cables-totaling 81,000 meters in length-were installed and the bridge deck lifted off temporary supports, all while the electrified railway lines beneath remained alive. Upon completion of the bridge, some felt that the costs incurred to reduce the risks had been excessive; others held that the risks were too high and not enough had been done to reduce them

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!