What activity / scope of work is the Work Plan developed for? (i.e. what is the crew
Fantastic news! We've Found the answer you've been seeking!
Question:
What activity / scope of work is the Work Plan developed for? (i.e. what is the crew being asked to do in the field?)
- What is to total contract value of the work included in this Work Plan?
- How many tolerances must the crew adhere to and verify in the field?
- In Step No. 7, to what depth must the backfill be added above the top of the pipe?
- When excavating the trenchline, what is the recommended spacing to set shores?
- When backfilling the trench, the slurry should be stopped how far below the existing utilities (like gas, phone, fiber, and water services)?
- When will the process take place to verify the tolerance that states "Variations from grade and alignment shall not exceed .1 FT"? (at what step will the tolerance check occur?)
- How many separate storm sewer crews are planned for the ARS Broadway Road Project as a whole?
- According to the 5-week look ahead, how many total weeks will this operation require?Briefly explain your answer.
- Explain why all Unit of Measure per Man-Hour (UOM / MH) numbers shown on page 1 are larger under the PRODUCTION GOALS (Financial Plan) section vs. the COST CODES & BUDGET SECTION?
- What are the top 3 things you found to be the best / most helpful about the Work Plan?
- What are the top 3 things you thought were missing? What could be improved?
Transcribed Image Text:
PKS Kiewit PLAN COMPLETED BY: OPERATION LOCATION: Segment 3 Prepared 2/4/15 SCOPE OF WORK: Excavate, Lay, and Backfill HDPE Storm Sewer Pipe COST CODES & BUDGET DESCRIPTION Unload and String HDPE ELB 18" HDPE - Mainline ELB 24" HDPE - Mainline ELB 30" HDPE - Mainline ELB 15"-18" HDPE - Laterals PRODUCTION GOALS (Financial Plan) Unload and String HDPE ELB 18" HDPE - Mainline ELB 24" HDPE - Mainline ELB 30" HDPE - Mainline ELB 15"-18" HDPE - Laterals EQUIPMENT 3/4 Ton Pickup 950 Loader 3/4 Ton Pickup 321 Excavator DESCRIPTION 950 Loader 950 Loader Walk Behind Roller (Rammex) SUPPLIES DESCRIPTION DESCRIPTION Shovels, Broom, & Digging Bars Ladders for each trench DESCRIPTION Pipe Bedding HDPE Pipe CLSM WBS 1158 1160 1161 1162 1159 ARS Broadway Road INSTALL STORM DRAIN WORKPLAN Paint, String-line, Plumb-bobs, Measuring tapes 10ft and 15ft. Lifting Slings and swivel hook Saw-zali and cutting blades Pipe lubricant Colored Cones PM'S QTY 4,010 2,248 758 103 901 QTY 4,010 2,248 758 103 901 UNIT LF LF LF LF LF QTY 4,329 TN 4,010 LF 615 CY UNIT LF LF LF LF LF 1 1 QTY Unload and String 1 1 1 1 UOM/MH 50.00 1.50 2.00 1.41 0.85 QTY 2 ea. As Req'd 2 ea. 2 ea. 1 ea. As Req'd 5 ea. color UOM/MH 53.75 1.61 2.15 1.52 0.91 YIELD 10% MANPOWER 3% 10% Load-out Spoils 1 ELB HDPE Mainline and Laterals Operator Foreman Operator Laborer UOM/HR 50.00 7.50 10.00 7.05 4.25 Operator Foreman Operator Laborer UOM/HR 53.75 8.06 10.75 7.58 4.57 DESCRIPTION Operator SUBS Total MH UNIT COST 80.20 1498.67 379.00 73.05 1060.00 SPECIAL TOOLS WAGE/HR TOTAL HOURLY $ 42.77 $ 40.91 $ 26.92 COST $ 42.77 $ 40.91 $ 26.92 TOTAL HOURLY COST TOTAL $ 0.74 $ 2,967.40 $ 23.79 $53,477.05 $ 17.84 $ 13,522.72 $ 25.27 $ 2,602.81 37,914.08 $ 42.08 $ Total MH 74.6 $ 0.68 $ 2,726.80 1396.3 $ 22.16 $49,815.68 352.56 $ 16.60 $ 12,582.80 67.76 $ 23.48 $ 2,418.44 990.1 $ 39.21 $ 35,328.21 $40.91 TOTAL HOURLY COST AGA SA SA SA Total: UNIT COST Total: QTY 1 1 1 1 2 2 1 DESCRIPTION Shoring, pump tools, release tools Rotating Laser, Grade-rods, Pipe Laser, Transit $ 110,484.06 TOTAL $ $ $ $ $ $ $ $ $ $ 102,871.93 COST/HR 42.77 40.91 26.92 110.60 42.77 81.82 53.84 178.43 40.91 40.91 QTY As Req'd 1 ea. H.W. Johnson - Catch Basin Form and Pour Olson Pre-Cast - Build Storm Drain Manholes SURVEY NEEDS (Attach Sketch) Staking every 50'. 15'-20' off sets to center line, Double stake M/H, Tees, Angle points (one each on opposite side of excavation or two in line 15' & 20' off set).Lath should have off set distance, cut to invert, stationing, & elevation of survey point. Also should denote M/H, Angle, Tee. Start, End, Etc. SAFETY DESCRIPTION Hazard Analysis Dig Permit Trench Insp. Form Shoring Insp. Form QUALITY ITEM SD GRADE/ALIGN COMPACTION BF MOISTURE DEFLECTION FIRST RULE OF SAFETY: Never Walk Past an Unsafe Act or Condition CRITICAL SAFETY CONCERNS/HAZARDS ISSUE REQUIRED(Y/N) Y Y Y Y 95 TO 100% + OR- 2% 1 DEGREE (4"/20") DONE BY: Foreman Foreman Foreman Foreman QUALITY ANALYSIS TOLERANCES .10 FOOT 4 - Excavate Trench line WHEN PRIOR TO START DAILY DAILY DAILY FIRST RULE OF QUALITY: Right the First Time POTENTIAL QUALITY ISSUES HOW VERIFIED? LASER/EYE LEVEL/TRANSIT DENISTY TESTS DENISTY TESTS LASER/TRANSIT/TAPE Trench Conditions Live Traffic Equipment 9 - Excavate for Storm Drain Manhole QUALITY ANALYSIS COMPLETED BY: Kevin Freeland HOLD POINTS IS unty cure over night before backill. 2 Check bedding grade before laying pipe 5- Place Pipe Bedding 6- Install Carrier Pipe 7 - Backfill Pipe Zone (Slurry) 8- Backfill Trench line W/ Native Material - Mainline Trenches ISSUE Damage to existing utilities Line and Grade Compaction 1 - Site Inspection - Verify Blue-Stake Dig Permit ***Review JHA w/ Crew. 2 - Verify Survey and Layout Excavation Centerline 3 - Excavation Guidelines - Shoring Plan/ Guidelines Pipe Joints Slurry Pipe Float WORK SEQUENCE / OPERATIONAL PLAN STEP BY STEP 10- Form and Pour Pipe Collars / SD Lateral Connections PREVENTION (Refer to Hazard Analysis) Proper trench sloping or shoring in place. Proper T/C and stay in-side work zone. Use Designated spotters/ eye contact. PREVENTION Blue-Stake / Dig Permit. Use of proper instruments / survey. Density testing of bedding and backfill. Keep clean / no debris inside pipe. Place slurry in small shallow lifts Review By: Initial & Date Foreman: Engineer: Field Supt: Project Mgr: PKS Kiewit PLAN COMPLETED BY: OPERATION LOCATION: Segment 3 Prepared 2/4/15 SCOPE OF WORK: Excavate, Lay, and Backfill HDPE Storm Sewer Pipe COST CODES & BUDGET DESCRIPTION Unload and String HDPE ELB 18" HDPE - Mainline ELB 24" HDPE - Mainline ELB 30" HDPE - Mainline ELB 15"-18" HDPE - Laterals PRODUCTION GOALS (Financial Plan) Unload and String HDPE ELB 18" HDPE - Mainline ELB 24" HDPE - Mainline ELB 30" HDPE - Mainline ELB 15"-18" HDPE - Laterals EQUIPMENT 3/4 Ton Pickup 950 Loader 3/4 Ton Pickup 321 Excavator DESCRIPTION 950 Loader 950 Loader Walk Behind Roller (Rammex) SUPPLIES DESCRIPTION DESCRIPTION Shovels, Broom, & Digging Bars Ladders for each trench DESCRIPTION Pipe Bedding HDPE Pipe CLSM WBS 1158 1160 1161 1162 1159 ARS Broadway Road INSTALL STORM DRAIN WORKPLAN Paint, String-line, Plumb-bobs, Measuring tapes 10ft and 15ft. Lifting Slings and swivel hook Saw-zali and cutting blades Pipe lubricant Colored Cones PM'S QTY 4,010 2,248 758 103 901 QTY 4,010 2,248 758 103 901 UNIT LF LF LF LF LF QTY 4,329 TN 4,010 LF 615 CY UNIT LF LF LF LF LF 1 1 QTY Unload and String 1 1 1 1 UOM/MH 50.00 1.50 2.00 1.41 0.85 QTY 2 ea. As Req'd 2 ea. 2 ea. 1 ea. As Req'd 5 ea. color UOM/MH 53.75 1.61 2.15 1.52 0.91 YIELD 10% MANPOWER 3% 10% Load-out Spoils 1 ELB HDPE Mainline and Laterals Operator Foreman Operator Laborer UOM/HR 50.00 7.50 10.00 7.05 4.25 Operator Foreman Operator Laborer UOM/HR 53.75 8.06 10.75 7.58 4.57 DESCRIPTION Operator SUBS Total MH UNIT COST 80.20 1498.67 379.00 73.05 1060.00 SPECIAL TOOLS WAGE/HR TOTAL HOURLY $ 42.77 $ 40.91 $ 26.92 COST $ 42.77 $ 40.91 $ 26.92 TOTAL HOURLY COST TOTAL $ 0.74 $ 2,967.40 $ 23.79 $53,477.05 $ 17.84 $ 13,522.72 $ 25.27 $ 2,602.81 37,914.08 $ 42.08 $ Total MH 74.6 $ 0.68 $ 2,726.80 1396.3 $ 22.16 $49,815.68 352.56 $ 16.60 $ 12,582.80 67.76 $ 23.48 $ 2,418.44 990.1 $ 39.21 $ 35,328.21 $40.91 TOTAL HOURLY COST AGA SA SA SA Total: UNIT COST Total: QTY 1 1 1 1 2 2 1 DESCRIPTION Shoring, pump tools, release tools Rotating Laser, Grade-rods, Pipe Laser, Transit $ 110,484.06 TOTAL $ $ $ $ $ $ $ $ $ $ 102,871.93 COST/HR 42.77 40.91 26.92 110.60 42.77 81.82 53.84 178.43 40.91 40.91 QTY As Req'd 1 ea. H.W. Johnson - Catch Basin Form and Pour Olson Pre-Cast - Build Storm Drain Manholes SURVEY NEEDS (Attach Sketch) Staking every 50'. 15'-20' off sets to center line, Double stake M/H, Tees, Angle points (one each on opposite side of excavation or two in line 15' & 20' off set).Lath should have off set distance, cut to invert, stationing, & elevation of survey point. Also should denote M/H, Angle, Tee. Start, End, Etc. SAFETY DESCRIPTION Hazard Analysis Dig Permit Trench Insp. Form Shoring Insp. Form QUALITY ITEM SD GRADE/ALIGN COMPACTION BF MOISTURE DEFLECTION FIRST RULE OF SAFETY: Never Walk Past an Unsafe Act or Condition CRITICAL SAFETY CONCERNS/HAZARDS ISSUE REQUIRED(Y/N) Y Y Y Y 95 TO 100% + OR- 2% 1 DEGREE (4"/20") DONE BY: Foreman Foreman Foreman Foreman QUALITY ANALYSIS TOLERANCES .10 FOOT 4 - Excavate Trench line WHEN PRIOR TO START DAILY DAILY DAILY FIRST RULE OF QUALITY: Right the First Time POTENTIAL QUALITY ISSUES HOW VERIFIED? LASER/EYE LEVEL/TRANSIT DENISTY TESTS DENISTY TESTS LASER/TRANSIT/TAPE Trench Conditions Live Traffic Equipment 9 - Excavate for Storm Drain Manhole QUALITY ANALYSIS COMPLETED BY: Kevin Freeland HOLD POINTS IS unty cure over night before backill. 2 Check bedding grade before laying pipe 5- Place Pipe Bedding 6- Install Carrier Pipe 7 - Backfill Pipe Zone (Slurry) 8- Backfill Trench line W/ Native Material - Mainline Trenches ISSUE Damage to existing utilities Line and Grade Compaction 1 - Site Inspection - Verify Blue-Stake Dig Permit ***Review JHA w/ Crew. 2 - Verify Survey and Layout Excavation Centerline 3 - Excavation Guidelines - Shoring Plan/ Guidelines Pipe Joints Slurry Pipe Float WORK SEQUENCE / OPERATIONAL PLAN STEP BY STEP 10- Form and Pour Pipe Collars / SD Lateral Connections PREVENTION (Refer to Hazard Analysis) Proper trench sloping or shoring in place. Proper T/C and stay in-side work zone. Use Designated spotters/ eye contact. PREVENTION Blue-Stake / Dig Permit. Use of proper instruments / survey. Density testing of bedding and backfill. Keep clean / no debris inside pipe. Place slurry in small shallow lifts Review By: Initial & Date Foreman: Engineer: Field Supt: Project Mgr:
Expert Answer:
Answer rating: 100% (QA)
Based on the provided work plan for the ARS Broadway Road project here are the key points and answer... View the full answer
Related Book For
Intermediate Accounting IFRS
ISBN: 978-1119372936
3rd edition
Authors: Donald E. Kieso, Jerry J. Weygandt, Terry D. Warfield
Posted Date:
Students also viewed these general management questions
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
KYC's stock price can go up by 15 percent every year, or down by 10 percent. Both outcomes are equally likely. The risk free rate is 5 percent, and the current stock price of KYC is 100. (a) Price a...
-
Planning is one of the most important management functions in any business. A front office managers first step in planning should involve determine the departments goals. Planning also includes...
-
15. The temperature C, in degrees, that is equivalent to a temperature of F degrees Fahrenheit is given by C- graph of this equation shows the temperature in Celsius for the corresponding...
-
A force F of magnitude 210 N acts at the origin of a coordinate system. Knowing that Fx = 80 N, z = 151.2, and Fy < 0, determine (a) The components Fy and Fz, (b) The angles x and y.
-
A researcher claims that more than 30% of U.S. smartphone owners use their phone (shopping, social networking and so on) while watching television. In a random sample of 150 adults, 38% say they use...
-
Renkas Heaters selected data for October 2017 are presented here (in millions): Calculate the following costs: 1. Direct materials inventory 10/31/2017 2. Fixed manufacturing overhead costs for...
-
Video Tech is considering marketing one of two new video games for the coming holiday season: Battle Pacific or Space Pirates. Battle Pacific is a unique game and appears to have no competition....
-
discuss the advantages and disadvantages of Database Management Systems (DBSMs). What do you personally think of Database Management Systems?
-
You are the Director in charge of developing a contract-pricing model for a complex project to modernize U.S. Navy Aircraft Carrier shipboard radar systems. Develop a 12-month, high-level pricing...
-
You are down on your luck and need a loan, quick! You locate Mr. Loa N. Shark who advertises weekly loans for an almost imperceptibly small rate of only 3 percent, prepaid at the time of loan. You...
-
How much money must be invested in an account that pays 6 percent per year interest to be worth $20,000 at the end of 8 years if (forgetting leap years and making convenient assumptions) a. interest...
-
You are helping a friend prepare a business plan for his already-prospering consultancy. Net revenue in year 1 is expected to be $140,000, increasing by 10% each year thereafter. If i =15% and the...
-
You put $20,000 on deposit on your thirtieth birthday at 5 percent compounded annually. On your fortieth birthday, the account begins earning 6 percent. Then on your fiftieth birthday, it begins...
-
Mario and Claudia deposit \($100\) into their joint account at the end of each month. If their account earns 7 percent/year/quarter (7 percent per year compounded quarterly), how long will it take...
-
Following is financial information describing the six operating segments that make up Fairfield, Inc. (in thousands): Consider the following questions independently. None of the six segments has a...
-
Wal-Mart is the second largest retailer in the world. The data file on the disk holds monthly data on Wal-Marts revenue, along with several possibly related economic variables. a) Using computer...
-
In 2019, Sato Ltd. received a grant for 2 million to defray the cost of purchasing research equipment for its manufacturing facility. The total cost of the equipment is 10 million. Prepare the...
-
The financial records of Dunbar Inc. were destroyed by fire at the end of 2019. Fortunately, the controller had kept the following statistical data related to the income statement. 1. The beginning...
-
Bedard Ltd. reported net income of 300,000 in 2019 and had 200,000 ordinary shares outstanding throughout the year. Also outstanding all year were 45,000 options to purchase ordinary shares at 10 per...
-
What types of noise are we likely to encounter in a professional environment? Are they physical, psychological, or physiological?
-
What does it mean to say that communication is dynamic? How can two people in a conversation be both senders and receivers simultaneously?
-
What is metacommunication, and how do people metacommunicate with one another?
Study smarter with the SolutionInn App