Question: what am I doing wrong? A time study was conducted on a job that contains four elements. The observed times and performance ratings for six

what am I doing wrong? A time study was conductedwhat am I doing wrong? A time study was conductedwhat am I doing wrong?

A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) 6 Element 1 2 3 4 Performance Rating 80% 75 100 85 1 0.47 1.47 0.82 1.07 2 0.52 1.47 0.82 1.12 3 0.42 1.42 0.72 1.07 4 0.42 1.42 0.77 1.12 5 0.42 1.42 0.82 1.12 0.42 1.47 0.77 1.17 Click here for the Excel Data File a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) Answer is complete and correct. Element Average cycle 0.445 1 2 1.445 3 0.787 4 1.112 b. Find the normal time for each element. (Round your answers to 3 decimal places.) Answer is complete and correct. Element Normal time 1 0.356 2 1.084 3 0.787 4 0.945 c. Assuming an allowance factor of 17 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.) Answer is complete but not entirely correct. Element 1 Standard time 0.429 X 1.306 X 0.948 X 2 3 4 1.138 X

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!