Question: What doriable production engineering cost is $ 8 3 9 , 7 9 0 and its total fixed level of 9 , 4 0 0

What doriable production engineering cost is $839,790 and its total fixed level of 9,400 machine-hours in a month? Note: Round intermediate calculations the
Multiple Choice
$114.64
$115.87
$115.60
$115.59
 What doriable production engineering cost is $839,790 and its total fixed