Question: Given 500mm dia. spun pile capacity is 2,000 kN: a) name 3 reason will you will choose pile foundation over footing system. b) column load
Given 500mm dia. spun pile capacity is 2,000 kN:
a) name 3 reason will you will choose pile foundation over footing system.
b) column load is 7500 kN, what is the reaction on each pile if the pile is installed at the correct position?
c) propose your estimated pile penetration depth using the SI information provided. Pile length to calculate from cut-off level. (FOS of 2 for both friction and base resistance, fs = 2N, fb =250N). What is the estimated min. require pile length if pile working capacity is 2000 kN (pile length shall be calculated below cutoff level).
d) based on the deviated pile position, what will the max. pile load is? Will there be a difference in max? pile load in comparison with piles installed at the correct position?
e) justify your finding at d) with calculation
f) based on your justification at e), is any rectification (remedial / strengthening ) proposal required? if yes, what is the proposal? please sketch.

| Depth (m) | Soil Type | SPT-N |
| 0 - 7 | Clay | 12 |
| 7 - 14 | Medium dense sand | 20 |
| 14 - 30 | Sandy clay | 30 |
| > 30 | Very dense sand | 50 |
Fs = 2N, FB = 250N, FOS for both Fs & FB is 2
| 1000 | 1000 | 1000 O O 1000 15001 20 5000 SPUN PILE DEVIATED PILE
Step by Step Solution
3.53 Rating (150 Votes )
There are 3 Steps involved in it
a Here are three reasons to choose pile foundations over a footing system 1 Load Transfer Piles can transfer structural loads through weak or compressible soil layers to stronger more competent soils ... View full answer
Get step-by-step solutions from verified subject matter experts