Question: what is the answer? A production engineer supervises the production of three types of components. Three kinds of materials (Metal, plastic, and rubber) are required
what is the answer?

A production engineer supervises the production of three types of components. Three kinds of materials (Metal, plastic, and rubber) are required for production. The amounts needed to produce each component are Component Metal (g/component) 1 19 2 8 3 7 Plastic (g/component) 0.25 0.82 0.33 Rubber (g/component) 0.9 1.2 2.4 If totals of (2120, 43.4, and 164) grams of metal, plastic, and rubber, respectively, are available each day, using Gauss-Seidel method, the exact number of components that can be produced per day is: Select one: O a component 1=96.62541, component 2=13.20684, component 3=25.49538 O b. component 1=96.5367, component 2=13.2249, component 3=25.5196 O c. not enough information O d. none of the answers is correct O e. component 1=96.6086, component 2=13.2029, component 3=25.5037
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
