Question: What is the forecast for week 16 using exponential smoothing with = 0.2? Assume that the forecast for week 1 was 80. What is the

What is the forecast for week 16 using exponential smoothing with = 0.2?
Assume that the forecast for week 1 was 80.
What is the mean square error for the forecast with = 0.2 as of week 15? Do not use week one in your calculations.
What is the period 15 tracking signal for the forecast with = 0.2?
What is the mean square error for the forecast with = 0.6 as of week 15? Do not use week one in your calculations.
What is the period 15 tracking signal for the forecast with = 0.6?
The number of flowers sold at The Blossom Shop on Fridays is shown in the table below. Week Demand Week Demand Week Demand 1 80 6 79 11 88 2 84 7 79 12 72 3 82 8 73 13 70 4 87 9 76 14 66 5 88 10 80 15 68 Round off all calculations to two decimal places. Maintaining two decimal places is required for all calculations What is the forecast for week 16 using exponential smoothing with a = 0.6? Assume that the forecast for week 1 was 80Step by Step Solution