Question: What is the learning curve slope parameter (s) if 200 hours are required to produce the first unit and 33.3 hours are required to produce
What is the learning curve slope parameter (s) if 200 hours are required to produce the first unit and 33.3 hours are required to produce the sixth unit? Select one: a. 50.0% Ob. 74.2% O c. 91.4% d. 99.9% e. 30.1%