Question: What key considerations did Sam encounter when preparing to develop the Work Breakdown Structure ( WBS ) for the raft project?Question 5 options:Outlined the functions
What key considerations did Sam encounter when preparing to develop the Work Breakdown Structure WBS for the raft project?Question options:Outlined the functions the raft needed to perform and documented themRecognized that the cost of the raft escalated faster than its size increaseAll listed optionsSketched the raft's design and derived a rough billofmaterials