Question: What should be considered when choosing between risk control measures? a . The required level of residual risk and the cost of the risk control
What should be considered when choosing between risk control measures?
a
The required level of residual risk and the cost of the risk control measures.
b
The required level of inherent risk and the cost of the risk control operations.
c
The required level of redundant risk and the cost of the risk control process.
d
The required level of superfluous risk and the cost of the risk control approach
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
