Question: What should be considered when choosing between risk control measures? a . The required level of residual risk and the cost of the risk control

What should be considered when choosing between risk control measures?
a.
The required level of residual risk and the cost of the risk control measures.
b.
The required level of inherent risk and the cost of the risk control operations.
c.
The required level of redundant risk and the cost of the risk control process.
d.
The required level of superfluous risk and the cost of the risk control approach