Question: When a process is set up optimally, the upper and lower specification limits typically are: Set inside the upper and lower control limits Set equal

When a process is set up optimally, the upper and lower specification limits typically are:
Set inside the upper and lower control limits
Set equal to the upper and lower control limits
Set an equal distance from the mean value
Set outside the upper and lower control limits