Question: When a process is set up optimally, the upper and lower specification limits typically are: a. Set equal to the upper and lower control limits
When a process is set up optimally, the upper and lower specification limits typically are:
a. Set equal to the upper and lower control limits
b. Set outside the upper and lower control limits
c. Set inside the upper and lower control limits
d. Set an equal distance from the mean value
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
