Question: When preparing an inspection and maintenance plan for a SWPPP on a construction site, personnel should inspect disturbed areas of the site at least once
When preparing an inspection and maintenance plan for a SWPPP on a construction site, personnel should inspect disturbed areas of the site at least once every seven days and within 24 hours of a storm that is ___ in. or greater. Group of answer choices .5 1 2 3
Step by Step Solution
There are 3 Steps involved in it