Question: When the upper and lower control limits of a process coincide with the upper and lower design specification, the process is considered capable True or
When the upper and lower control limits of a process coincide with the upper and lower design specification, the process is considered capable
True or false?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
