Question: Which activity should be crashed first for the project shown in table below? (Hint: The critical path is ABCE) ACTIVITY NORMAL CRASH TIME TIME NORMAL

Which activity should be crashed first for the
Which activity should be crashed first for the project shown in table below? (Hint: The critical path is ABCE) ACTIVITY NORMAL CRASH TIME TIME NORMAL COST ($000s) CRASH AVAILABLE COST WEEKS OF ($000s) CRASHING A 4 2 8 B 3 2 9 2 1 10 D 14 11 18 11 14 5 5 4. 4 1 3 1 E 2 10 11 6 F 3 3 1 8 2 O E or F o D B O B or C OE