Question: Which one is False? Select one: a. Group technology can be used to reduce setup cost and time in a JIT conversion. b. Manufacturing cells
Which one is False? Select one:
a. "Group technology" can be used to reduce setup cost and time in a JIT conversion.
b. Manufacturing cells in JIT systems process similar parts for a product.
c. A benefit of JIT is the flexibility to handle a mix of products within a short time frame
d. Setup time and cost can often be reduced by the use of group technology.
e. The small lot-sizing policy works well in a situation where both holding costs and setup costs are high.
A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results:
| Machine | Measurements | |||
| #1 | 17 | 15 | 15 | 17 |
| #2 | 16 | 25 | 18 | 25 |
| #3 | 23 | 24 | 23 | 22 |
Using the factors for three sigma control limits, what are the sample range (R) chart upper and lower control limits?
Select one:
a. 11.14 and 0
b. 4.33 and 0
c. 4.94 and 0
d. 8.66 and 0
e. 9.88 and 0
The Chair of the Operations Management Department at Quality University wants to construct a _control _chart for determining whether the four instructors teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results:__INSTRUCTORNUMBER OF FAILURESProf. A13Prof. B0Prof. C11Prof. D16What are the .95 (5% alpha risk) upper and lower control limits for the _p_-chart? Select one:
Select one:
a. .16 and .04
b. .95 and .05
c. .1774 and .0226
d. .13 and .07
e. .1588 and .0412
For the constraints given below, which point is in the feasible solution space of this maximization problem?(1) 14x + 6y <= 42(2) x - y <= 3
Select one:
a. x = 2, y = 1
b. x = -1, y = 1
c. x = 1, y = 5
d. x = 2, y = 8
e. x = 4, y = 4
Which one is True?
Select one:
a. A p-chart is used to measure shifts in process dispersion.
b. ample range control charts are used to measure shifts in the process mean.
c. If a point on a control chart falls outside one of the control limits, this suggests that the process output is non-random, assignable variation.
d. Attributes are process characteristics that must be measured rather than counted.
e. A _c_-chart is used to monitor the number of defectives in the output of a process.
Which one is correct?Select one:
Select one:
a. ISO 9002 is an international standard for assessing a company's environmental performance.
b. Suppliers are partners in TQM and should be included in quality improvement efforts.
c. Quality control tends to be a proactive approach to quality management.
d. A control chart is a visual representation of the key steps in a process.
e. A benchmark organization must be chosen from the same industry in order for its methods to be applicable.
Given the following historical data and weights of .5 for the most recent period, .3 for the next most recent, and .2 for the next after that, what is the weighted three-period moving average forecast for period 5?
| Period | Value | Period | Value |
| 1 | 138 | 3 | 148 |
| 2 | 142 | 4 | 144 |
Select one:
a. 144.80
b. 144.00
c. 144.67
d. 143.00
e. 144.20
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
