Question: Which one would not be a reason for using ERP, or would all be reasons? * 1 point all are reasons. Standardize production processes. Standardize
Which one would not be a reason for using ERP, or would all be reasons? *
1 point
all are reasons.
Standardize production processes.
Standardize HR information.
Integration of financial data.
Interconnect production, sales, and distribution on a single server.
According to the global company profile, Amazon.com's advantage in inventory management comes from its almost fanatical use of economic order quantity and safety stock calculations. *
1 point
false
true
Which one of these is not considered a determinant of quality? *
1 point
Service after delivery.
Conformance to design.
Customer surveys.
Ease of use.
Design.
The ________ model adds objectivity to decision making when selecting suppliers. *
1 point
Your answer
Which MRP lot-sizing technique should be considered to be the goal (i.e., the technique of choice under ideal conditions)? *
1 point
Silver-Meal
lot-for-lot
Wagner-Whitin
EOQ
POQ
In the basic queuing model (M/M/1), what probability distribution describes service times? *
1 point
lognormal
negative exponential
Poisson
normal
binomial
The quality tool that plots the number of quality problems over time is: *
1 point
Control chart.
Cause-and-effect diagram
Pareto diagram
Fishbone diagram.
Run chart.
Setup costs are analogous to which one of these costs? *
1 point
excess
holding
ordering
shortage
Wheeled Coach obtains competitive advantage through MRP in part because of their excellent record integrity and insistence on record accuracy. *
1 point
false
true
Which of the following is most likely to violate a FIFO queue? *
1 point
fast-food restaurant
All of the answers are equally likely to violate a FIFO queue.
car repair garage
emergency room
supermarket with no express lanes
In MRP, planned order receipts must always equal *
1 point
planned order releases
net requirements
gross requirements
scheduled receipts
The two characteristics of the waiting line itself are whether its length is limited or unlimited and the discipline of the people or items in it. *
1 point
true
false
A finite population waiting line model has an average service time T of 100 minutes and an average time between service requirements U of 400 minutes; the service factor X is 0.25. *
1 point
fasle
true
A paint company mixes ten different base colors into 3,000 different color options. If production scheduling is organized around the ten different base colors , then the bills of material are classified as which of the following? *
1 point
planning
low-level
phantom
modular and low-level
modular
Which one is not a strategy for managers who want to reduce customer waiting time? *
1 point
Increase prices for late arrivals.
Increase the number of servers.
Standardize the service.
Offer discounts for off-times.
Firms making many different final products use ________ to facilitate production scheduling. *
1 point
gross requirements bills
modular bills
overdue bills
planning bills
phantom bills
The term that relates to matching the output rate with customer demand in a JIT system is: *
1 point
closed-loop JIT
takt time
fill rate
single-minute exchange of die
In the production order quantity (POQ) model, inventory does not arrive in a single moment but flows in at a steady rate, resulting in a larger production/order quantity than in another wise identical EOQ problem. *
1 point
false
true
The term bullwhip effect is most closely related to: *
1 point
inventory turnover
assertive customers
return of inventory
inventory security
demand variations
Which product is usually bought on a fixed interval basis? *
1 point
sugar
textbooks
brownies
wedding gifts
Which one is not included in the list of seven wastes? *
1 point
overproduction
processing wastes.
poor product design
product defects
inefficient work methods
Low level coding refers to *
1 point
Using low levels of coding to simplify identification of components in an MRP setup.
None of these.
Having low level employees input product codes into computer data banks.
Structuring a bill of materials so that multiple occurrences of an item coincide with the lowest level that the item occurs.
A key goal of MRP is to: *
1 point
Use Scheduled Receipts only when necessary.
Match supply and demand.
Avoid cost overruns.
All are key goals.
Order early to avoid late-order penalties.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts