Question: Why does the cost to load in an unconstrained system is lower compared to contrained with N - 1 Contingency in PLEXOS Modelling? What are

Why does the cost to load in an unconstrained system is lower compared to contrained with N-1 Contingency in PLEXOS Modelling? What are the factors that affect the increase in cost to load during contrained N-1 contingency scenario?

Step by Step Solution

3.45 Rating (158 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

In PLEXOS modeling or energy system modeling in general the cost to load refers to the overall economic cost of supplying electricity to meet the dema... View full answer