Question: WILL THUMBS UP CORRECT ANSWER! Thank you for helping! :) An appliance manufacturer wants to contract with a repair shop to handle authorized repairs in

WILL THUMBS UP CORRECT ANSWER! Thank you forWILL THUMBS UP CORRECT ANSWER! Thank you for helping! :)

An appliance manufacturer wants to contract with a repair shop to handle authorized repairs in Indianapolis. The company has set an acceptable range of repair time of 54.00 minutes to 84.00 minutes. Two firms have submitted bids for the work. In test trials, Firm A had a mean repair time of 66.00 minutes with a standard deviation of 3.50 minutes; and the other firm, Firm B, had a mean repair time of 70.00 minutes with a standard deviation of 5.25 minutes. Compute the following capability indices for both firms: Capability Index FIRMA FIRM B Lower: Upper: Process: Given the minimum threshold value of 1.00 for process capability, which firm would you choose? (Enter "FIRM A, FIRM B" or "NONE"): NOTE: All values should be rounded to the nearest hundredth (two decimal after dot, for example 9.99)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!