Question: Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 54 units. The process time for each step is as follows:
| Process Step 1 | 6 | minutes |
| Process Step 2 | 9 | minutes |
| Process Step 3 | 4 | minutes |
| Process Step 4 | 8 | minutes |
The time required to move each batch between steps is 16 minutes. In addition, the time to move raw materials to Process Step 1 is also 16 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 16 minutes.
The new lean layout will allow the company to reduce the batch sizes from 54 units to 3 units. The time required to move each batch between steps and the inventory locations will be reduced to 3 minutes. The processing time in each step will stay the same.
Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place.
| Present Approach | Proposed Approach | |||
| Value-added time | min | min | ||
| Non-value-added time | min | min | ||
| Total lead time | min | min | ||
| Value-added ratio (as a percent) | % | % | ||
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts