Question: With masonry, estimators need to include standards established by the local building codes. True False 5 points QUESTION 3 Masonry work that can be laid

  1. With masonry, estimators need to include standards established by the local building codes.

    True

    False

5 points

QUESTION 3

  1. Masonry work that can be laid up without the use of scaffolding is generally the least expensive, but that is typically limited to six to seven feet.

    True

    False

5 points

QUESTION 4

  1. The least expensive 'bond' is the running bond.

    True

    False

5 points

QUESTION 5

  1. Concrete block has no complete standard of sizes.

    True

    False

5 points

QUESTION 6

  1. When working up a quantity takeof, the estimator need only to separate masonry according to the size of the units.

    True

    False

5 points

QUESTION 7

  1. Many specifications designate a cash allowance for the purchase of face bricks.

    True

    False

5 points

QUESTION 8

  1. Cold weather construction is less expensive than warm weather construction.

    True

    False

5 points

QUESTION 9

  1. Both aluminum and steel are sold by weight, so the takeof is made in pounds and converted into squares.

    True

    False

5 points

QUESTION 10

  1. It is not necessary to include in the estimate the accessories required when doing a takeoff on structural metal.

    True

    False

5 points

QUESTION 11

  1. When lumber is surfaced by a planing member, it is referred to as 'dressed'.

    True

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!