Question: With masonry, estimators need to include standards established by the local building codes. True False 5 points QUESTION 3 Masonry work that can be laid
-
With masonry, estimators need to include standards established by the local building codes.
True
False
5 points
QUESTION 3
-
Masonry work that can be laid up without the use of scaffolding is generally the least expensive, but that is typically limited to six to seven feet.
True
False
5 points
QUESTION 4
-
The least expensive 'bond' is the running bond.
True
False
5 points
QUESTION 5
-
Concrete block has no complete standard of sizes.
True
False
5 points
QUESTION 6
-
When working up a quantity takeof, the estimator need only to separate masonry according to the size of the units.
True
False
5 points
QUESTION 7
-
Many specifications designate a cash allowance for the purchase of face bricks.
True
False
5 points
QUESTION 8
-
Cold weather construction is less expensive than warm weather construction.
True
False
5 points
QUESTION 9
-
Both aluminum and steel are sold by weight, so the takeof is made in pounds and converted into squares.
True
False
5 points
QUESTION 10
-
It is not necessary to include in the estimate the accessories required when doing a takeoff on structural metal.
True
False
5 points
QUESTION 11
-
When lumber is surfaced by a planing member, it is referred to as 'dressed'.
True