Question: With reference to Drawing No . TP - 0 1 , prepare a take - off list and take off the quantities of cut and

With reference to Drawing No. TP-01, prepare a take-off list and take off the quantities of cut and fill for the site formation works with the grid lines provided.
(Note: The reduced level is 40.000m)Note :
Reduced level is 40.000.
Topgraphic Survey Plan
Drawing No. TP-01(Rev.03)
(not to scale)