Question: With reference to the cost data given, build up the unit rates for all items in the Bills of Quantities below: ITEM DESCRIPTION UNIT aTY

With reference to the cost data given, build up the unit rates for all items in the Bills of Quantities below:
ITEM
DESCRIPTION
UNIT
aTY
BILL NO.9: DOOR AND WINDOW
RATE
AMOUNT
B
Nyatoh solid door
40mm Thick double leaf Nyatoh solid door overall size 1800mm x 2100mm high hanging on butt hinges (measured separately)(Tyoe D1)
Heavy duty casement window
38mm Thick side hung heavy duty powder coated aluminium casement window overall size 600mm x 1800mm with tinted glass (glass measured separately)
NO
NO
Ironmongery
100mm pressed steel butt hinges and fixed to timber
D
100mm diameter x 150mm long flush barrel bolts and fixed to timber
NO
E
Black Hardware entrance gripset and double handle door lock
NO
4
22
32
8
4
TOTAL CARRIER TO SUMMARY
Material Data:
MATERIAL
SUPPLIED COST
Delivered to site
USAGE
1. Double leaf Nyatoh door -1800mm x 2100mm
2. Aluminium casement window -600mm x 1800mm
3. Steel butt hinges
4. Flush barrel bolts
5. Entrance gripset and double handle door lock
Labour Data:
RM4,280.00/no RM620.00/no RM13.50/no RM20.00/no RM186.00/no
LABOUR
LABOUR COSTS and USAGE
LABOUR CONSTANT
skilled
RM120.00
unskilled
RM80.00
1. To fix door to frame
0.85 hour/m2
2. To fix window to frame
1.00 hour/m2
3. To fix ironmongery to timber door
111
0.50 hour/m2
4. To fix lockset to timber door
1.25 hour/m2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!