Question: With the attached MRP sheets, complete the MRP grids. Master Production Schedule for X1 Period 7 8 9 Gross requirement 45 Item Lead Ti X1

With the attached MRP sheets, complete the MRP
With the attached MRP sheets, complete the MRP grids. Master Production Schedule for X1 Period 7 8 9 Gross requirement 45 Item Lead Ti X1 1 2 2 1 1 1 3 Subassembly X1 B1 B2 A1 C D E A1(1) B1(1) E(1) On Har C(2) 50 5 20 5 0 0 10. 82(2) D(1) E(2) 10 20 11 12 200