Question: Work Breakdown Structure Renovation Project Administration Renovation Closeout and design Administration Design Construction Acceptance Renovation Renovation Design Wall Floor Ceiling Clean out Inspection contract materials


Work Breakdown Structure Renovation Project Administration Renovation Closeout and design Administration Design Construction Acceptance Renovation Renovation Design Wall Floor Ceiling Clean out Inspection contract materials drawings Check Install Living Scope Laminate Painting Level floor Quality flooring drawings ceiling room Install Budget Baseboard Verify laminate Painting Bedroom Appearance drawings floor Formaldehyde Painting Output Install Kitchen Index Schedule tools drawings baseboard Bathroom