Question: Worker A Worker B Worker C Run time = 2 min / unit C / O = 1 3 min Run time = 3 min

Worker A Worker B Worker C
Run time =2 min/unit
C/O =13 min
Run time =3 min/unit
C/O =7 min
Run time =3 min/unit
C/O =6 min
For differing process batch sizes (1,10,30), answer the
following:
1. Expected cycle time of the department
2. Raw processing time
3. Critical WIP level of the department
4. Expected LT when WIP =10 batches
5. Daily capacity, assuming two, 480-minute shifts
CTA = RT + C/O =2+13=15
min.
3+7=10 min. 3+6=9 min.