Question: write an email asking the building designer about does his service include all the detail of ARCHITECTURAL DRAWINGS shows in the pictures. if answer is

write an email asking the building designer about does his service include all the detail of ARCHITECTURAL DRAWINGS shows in the pictures. if answer is yes, then we can move forward to next step

EGBP BUILDING SURVEYORS INFORMATION TO ACCOMPANY AN APPLICATION (DWELLING) The following information must be submitted with your application*: 1. APPLICATION FORM Completed, signed and dated 2. APPOINTMENT OF BUILDING SURVEYOR ARCHITECTURAL DRAWINGS Plan at each floor level with dimensions (scale 1:100 min) All elevations (scale 1:100 min) Sections (scale 1:100 min) The size locations of structural members Any additional details to show compliance (scale 1:20) Site / allotment plan showing dimensions (of allotment), existing conditions, relevant easements, distance to intersecting street, location of proposed building and any existing buildings on site Levels of proposed allotment, proposed floor level(s) . Legal point of discharge to be shownoted on site/allotment plan and stormwater exiting to legal point of discharge. Details of adjoining developments showing; boundary, habitable windows distances from boundary, fence details (including height type), offset from front boundary Levels of the allotment and floors, layout of drains and discharge point (scale 1:500) The location, dimensions and area of private open space for the purposes of regulation 86. The location, dimensions and area of impermeable surfaces covering the allotment if necessary for the purposes of regulation 77. The location, dimensions of car parking spaces for the purposes of regulation 78. 4. SPECIFICATIONS Describe materials and methods to be used in construction 5. SOIL REPORT Show soil classification 6. SOIL PERCOLATION TEST PERMIT TO INSTALL/ALTER A SEPTIC TANK OR REPORT AND CONSENT REGULATION 132 If applicable 7. COMPUTATIONS AND DESIGN For any structural members not within building code, together with Certificate of Compliance (Reg 126) Footings engineered 8. ROOF TRUSS PLAN Showing bracing and truncated / girder truss locations P9. SIX STAR ENERGY RATING STAMPED PLANS From an accredited energy rater 10. BUILDERS WARRANTY INSURANCE If cost of building works is $16,000, or more. Page 1 of 2 Form 126 - Structural building inspection

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!