Question: X = 8 . 1 5 In a biscuit factory locating in Izmit, industrial engineers have decided to implement time study analysis to increase productivity

X =8.15
In a biscuit factory locating in Izmit, industrial engineers have decided to implement time study analysis to increase productivity of one of the work stations. At the work station, one of the operations composed of A, B, and C tasks, is analyzed. Observations are displayed in the following table. The allowance time for this operation is set to 8%. Based on these, compute normal times and standard time for the operation for a 90% confidence interval.
\table[[,Tasks],[Observations,A,B,C],[1,x,7.45,5.22],[2,8.25,7.75,5.36],[3,7.55,8.05,5.78],[4,8.05,7.55,5.55],[5,8.00,7.50,5.48],[\table[[Performance],[Rating (%)]],85,95,110]]
\table[[\table[[Sum of],[the],[numbers],[in your],[student],[ID]],x
 X =8.15 In a biscuit factory locating in Izmit, industrial engineers

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!