Question: You are a process optimization consultant and asked to design a shipyard based on the following information. Please use Microsoft PowerPoint to show your drawings
You are a process optimization consultant and asked to design a shipyard based on the following information. Please use Microsoft PowerPoint to show your drawings and calculations. The shipbuilding process will have nine stages (Reference: floorganise.com), as illustrated below.
Main activity of each ship building stage The process cycle time is 70 weeks. Slipway outfitting and quay outfitting have equal and most extended process times (21 weeks each).
All other stations have different process times in weeks or multiples (all integers).
Draw the assembly line. Show names and process times.
Calculate the capacity of the shipyard.
Add three parallel lines to the system to get the best capacity. Draw the new assembly line and calculate the bottleneck, cycle time and the new capacity.
If you increase the efficiency of the new bottleneck and reduce its process time by 50%, what will be the new bottleneck, cycle time and capacity? Please draw the new assembly line and show your calculations.
Make sure your assignment has a professional look
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
