Question: You are designing a production system for a process that has two serial operations, process A , followed by process B ; connected by a

You are designing a production system for a process that has two serial operations, process A, followed by process B; connected by a material handling system. Data for the processing operations is provided below.
\table[[,Average processing time (minutes),Std Dev of processing time],[Process A,14,4],[Process B,20,6]]
Demand is 8,000 parts per year (or 0.05 per minute), and process replenishment lead-time is based on 0.99 probability of process completion )=(2.33. The item has a value of $150, and the annual holding rate is 20%. Assume the material handling replenishment lead-time for a part is 0.05 years. Assume a 25% safety factor.
The two processes are separated by 200 feet. There are two material handling system alternatives: MH_1 has an annual fixed cost of $10,000 and a variable cost of $0.40 per load per foot and can transport up to 100 units per load, or MH_2 has an annual fixed cost of $20,000 and a variable cost of $0.05 per load per foot and can transport up to 200 units per load.
 You are designing a production system for a process that has

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!