Question: You are designing a production system for a process that has two serial operations, process A , followed by process B; connected by a material

You are designing a production system for a process that has two serial operations, process A, followed by process B; connected by a material handling system. Data for the processing operations is provided below.Std Dev of processing timeAverage processing time (minutes)Process A14Process B20Demand is 8,000 parts per year (or 0.05 per minute), and process replenishment lead-time is based on 0.99probability of process completion (Za =2.33). The item has a value of $150, and the annual holding rate is 20%.Assume the material handling replenishment lead-time for a part is 0.05 years. Assume a 25% safety factor.The two processes are separated by 200 feet. There are two material handling system alternatives: MH_1 has an annual fixed cost of $10,000 and a variable cost of $0.40 per load per foot and can transport up to 100 units per load, or MH_2 has an annual fixed cost of $20,000 and a variable cost of $0.05 per load per foot and can transport up to 200 units per load.a)(10%) Determine the total number of material-handling Kanbans based on the information provided.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!