Question: You are designing a production system for a process that has two serial operations, process A , followed by process B; connected by a material
You are designing a production system for a process that has two serial operations, process A followed by process B; connected by a material handling system. Data for the processing operations is provided below.Std Dev of processing timeAverage processing time minutesProcess AProcess BDemand is parts per year or per minute and process replenishment leadtime is based on probability of process completion Za The item has a value of $ and the annual holding rate is Assume the material handling replenishment leadtime for a part is years. Assume a safety factor.The two processes are separated by feet. There are two material handling system alternatives: MH has an annual fixed cost of $ and a variable cost of $ per load per foot and can transport up to units per load, or MH has an annual fixed cost of $ and a variable cost of $ per load per foot and can transport up to units per load.a Determine the total number of materialhandling Kanbans based on the information provided.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock