Question: You are given a post - development hydrograph for a design storm ( table on right ) , and are asked to route the hydrograph
You are given a postdevelopment hydrograph for a design storm table on right and are asked to route the hydrograph through a acre verticalwalled detention pond with a vertical riser pipe figure below that includes a circular orifice centered ft above the bottom of the pond Co: diameter :ft and the top of the riser forms a weirorifice feet above the bottom of the pond CwCo: diameter ft Assume the pond is empty at the beginning of the storm event. Assume flow through the lower orifice is negligible for depths of less than ft For routing calculations, use Deltatmin. For the SIV table, use DeltaHft Report the following:
a A plot of outflow versus pond elevation based on SIV table for depths from zero to six feet. Also provide the beginning of your SIV table up to a depth of ft
b A plot of the inflow and outflow hydrographs on the same axes for up to minutes Also provide the beginning of your routing table up to minutes
c A plot of pond stage depth versus time.
d The peak outflow rate and corresponding pond stage and volume.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock