Question: You are preparing a preliminary elemental cost estimate for a proposed building with a GFA of 100,000 sf, based on the previously completed project with

You are preparing a preliminary elemental cost estimate for a proposed building with a GFA of 100,000 sf, based on the previously completed project with 150,000 sf of GFA. The previously completed project's actual overall construction cost was $300 psf and the structural framing elemental cost for this project was 15% of the total cost. What would be the estimated cost for the structural framing for your proposed project? Question 30 options: $6,750,000