Question: You are tasked with evaluating ore management systems in a block caving operation. The three major systems in block caving are: ( 1 ) the

You are tasked with evaluating ore management systems in a block caving operation.
The three major systems in block caving are: (1) the Grizzly or Gravity System, (2) the
Slusher System, and (3) the Rubber-Tired System. Each system employs different
production equipment for ore handling.
2.1. Compare and contrast the Grizzly or Gravity System, the Slusher System, and
the Rubber-Tired System. Discuss the advantages and limitations of each
system for managing ore in a block caving operation. (6 marks)
2.2. Given a block caving operation with a large, high-grade ore body and varying
ore sizes, recommend the most suitable ore management system. Justify your
choice based on factors such as ore handling efficiency, system flexibility, and
overall cost-effectiveness. Consider the impact of ore size variations and
operational challenges on your recommendation. (5 marks)
2.3. Draw a large, neat, clearly labelled diagram showing LHD units loading directly
out of drawpoints that lie below the cones and transport the ore to the
orepasses. (4 marks)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!