Question: You are the project manager on an electrical upgrade project. There are a total of 8.6 miles of power lines being buried. A pull box
You are the project manager on an electrical upgrade project. There are a total of 8.6 miles of power lines being buried. A pull box needs to be installed every 500 feet. A four man crew can install o