Question: You have been asked to do a conceptual design layout of a wind farm intended to produce a maximum of 1 0 0 0 MW

You have been asked to do a conceptual design layout of a wind farm intended to produce a maximum of 1000 MW of power.
a. If the turbine described in problem 1 is the one to be considered for this wind farm and you can extract a maximum of 1 MW of power per sq.km. of land area (due to turbineturbine interactions as well as effects of the turbines slowing down the wind), what is the spacing between turbines?
b. How many turbines are required to meet the maximum design power?
c. If the capacity factor of the site is 0.35, what will be the average poweravailable from all the turbines? [Answer: 350 MW .]
d. Research the capital costs of wind turbines \(\$ \mathrm{USD}/\mathrm{kW}\) installed. What would this wind farm cost to install? [Answer: Around \$USD 1.7Bn, depending on estimated installed cost per kw.]
You have been asked to do a conceptual design

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!