Question: You have been assigned as the project manager for a home construction project. The job is to start in 2 months from today's date and

You have been assigned as the project manager for a home construction project. The job is to start in 2 months from today's date and should be completed within 6 months from the start date. You already have the architectural and technical drawings as shown above. The financing and all the necessary building and site permits for the project have already been secured. DO NOT USE MS PROJECT FOR THIS ASSIGNMENT Draw a WBS for this project. (10 marks) Do not go beyond level 2 as shown (i.e. Level 0 - Name of the Project, Level 1, Level 2). Level 1 should completely cover (at a high level) all the things that need to be delivered in a fully constructed house including foundation works. Do not go beyond 5 items as doing so will make the rest of this assignment long and tedious. Level 2 should detail the subcomponents of Level 1 and should not go beyond 15 items in total. A diagram of components with colorful textDescription automatically generated On a separate diagram develop activity lists for all the deliverables at Level 2 as shown. (10 marks) A diagram of a productDescription automatically generated Develop a WBS dictionary showing

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!