Question: You have been tasked with migrating an existing physical server infrastructure to a virtualized infrastructure. An initial analysis of the physical infrastructure has identified the
You have been tasked with migrating an existing physical server infrastructure to a virtualized
infrastructure.
An initial analysis of the physical infrastructure has identified the servers that can be migrated to
virtual machines and run on Hypervisors.
You are required to come up with a design that will facilitate the migration to a virtual infrastructure.
To do this you need to identify the following:
The number of Hypervisors required:
i To run the virtual machines without any spare capacity
ii To run the virtual machines with spare capacity
iii. To provide High Availability for all virtual machines Marks
The amount of memory RAM consolidation that can be safely achieved. Then, use this to
calculate how much memory will be required for each Hypervisor. Marks
The cost savings in terms of the power required to run the Hypervisors versus the physical
servers over a year Given that each server consumes w of power, requires w of
cooling, and electrical power costs c per kilowatthour Marks
The requirements for the shared storage environment.
This involves identifying:
i The number of hard disks required to store the virtual machine files
ii How the virtual machine files can be protected against disk failure
iii. The number of hard disks after the protection mechanism has been implemented
iv The cost of the overall shared storage solution Marks
A sample diagram of the proposed infrastructure include Hypervisors, shared storage and
network infrastructure As well as this you should give a detailed description of the
components shown in the diagram Marks
Case Study Specification:
To assist you in this process you have been provided with the following information:
There are physical servers that are to be migrated to virtual machines
Of the machines:
o are nonclustered with CPU utilization and GB of RAM @ utilization
per server
o are clustered with CPU utilization and GB of RAM @ utilization per
server and must support peak loads x higher
o All machines have the same basic storage configuration of a single GB hard
disk for the operating system that the server would boot from and a second GB
hard disk that was used for the servers data.
The shared storage solution will use TB enterprise hard disk drives
The cost of each TB enterprise disk for the SAN is
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
