Question: You have been tasked with migrating an existing physical server infrastructure to a virtualized infrastructure. An initial analysis of the physical infrastructure has identified the

You have been tasked with migrating an existing physical server infrastructure to a virtualized
infrastructure.
An initial analysis of the physical infrastructure has identified the servers that can be migrated to
virtual machines and run on Hypervisors.
You are required to come up with a design that will facilitate the migration to a virtual infrastructure.
To do this you need to identify the following:
1. The number of Hypervisors required:
i. To run the virtual machines without any spare capacity
ii. To run the virtual machines with 40% spare capacity
iii. To provide High Availability for all virtual machines 25 Marks
2. The amount of memory (RAM) consolidation that can be safely achieved. Then, use this to
calculate how much memory will be required for each Hypervisor. 10 Marks
3. The cost savings in terms of the power required to run the Hypervisors versus the physical
servers over a year (Given that each server consumes 500w of power, requires 500w of
cooling, and electrical power costs 10c per kilowatt-hour).15 Marks
4. The requirements for the shared storage environment.
This involves identifying:
i. The number of hard disks required to store the virtual machine files
ii. How the virtual machine files can be protected against disk failure
iii. The number of hard disks after the protection mechanism has been implemented
iv. The cost of the overall shared storage solution 25 Marks
5. A sample diagram of the proposed infrastructure (include Hypervisors, shared storage and
network infrastructure). As well as this you should give a detailed description of the
components shown in the diagram 25 Marks
Case Study Specification:
To assist you in this process you have been provided with the following information:
There are 100 physical servers that are to be migrated to virtual machines
Of the 100 machines:
o 76 are non-clustered with 15% CPU utilization and 8GB of RAM (@10% utilization)
per server
o 24 are clustered with 12% CPU utilization and 8GB of RAM (@15% utilization) per
server and must support peak loads 2x higher
o All 100 machines have the same basic storage configuration of a single 30 GB hard
disk for the operating system that the server would boot from and a second 200 GB
hard disk that was used for the servers data.
The shared storage solution will use 1TB enterprise hard disk drives
The cost of each 1 TB enterprise disk for the SAN is 1000

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Programming Questions!