Question: You have collected the following time study data in your facility. Assuming 1 5 % allowances, find the standard time for this operation and determine
You have collected the following time study data in your facility. Assuming allowances, find the standard time for this operation and determine the standard production rate cartons per shift for this activity. Assume a minute shift with paid minute breaks and a paid minute lunch.
tableElementtable# ofobstableTotalOTminRating,,tableNTctnmintableSTctnmintable Install grimsnort into widget grimsnorts per widgettable Install protective case on widget,run diagnostics, place in boxtable Seal boxes of widgets in hardplastic packaging, place inshipping cartontable Seal shipping carton containing plastic packages scan intoinventorytable Obtain carton of widget boxestable Obtain carton of hard plasticpacking sleevestable Run quality status report every cartonstable Housekeepingsupply restock atend of shift
Fill in the table above with the Normal Times and Standard Times per carton widgets per package, packages per carton for the operation.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock