Question: b. Simulate 5 project completion experiences using random numbers from Appendix B. What is the expected project duration time? 16.16. Consider the travel network shown

b. Simulate 5 project completion experiences using random numbers from Appendix B. What is the expected project duration time?

16.16. Consider the travel network shown in Figure 16.12 in which the probabilities of selecting a route from each node are shown in parentheses.